Skip to main content

FB Paving/Cold Mix Asphalt

FB Paving/Cold Mix Asphalt

From freezing to heat waves, the climate can wreak havoc on roads. With a cold mix asphalt treatment like FB Paving, or Flexible Base Paving, you can repair medium traffic roads displaying significant distress and a deteriorating base after 10-15 years of service. 

CATEGORY 5

Cold Mix Asphalts

For Road Age:

10-15 Years

Extends Life of Road:

18-20 Years

Available at:

Akron, Mercer, Baltimore, Greensboro

FB Paving/Cold Mix Usage Guide

Benefits

Why We Use FB Paving

  • Flexible, pliable material reverts to original structure after a freeze-thaw cycle
  • Significant cost savings over traditional FDR or hot mix paving
  • Extends paving season due to ambient temperature application
  • Saves more of existing road surface, furthering customer savings
  • Highly resilient, requires no additional surface treatment

When to Use

FB Paving Works Best

  • In climates with severe temperature fluctuations 
  • On surfaces where rigid pavement has failed 
  • On low-volume roads with weak base courses

Process

How We Apply FB Paving

  • Level existing pavement 
  • Apply a 2-inch compacted cold-mix overlay 
  • Reverts to original structure after freeze-thaw cycle

Docmentation

Safety Data Sheets

Together, We Can Do It All

Get in touch to see how FB Paving can extend the life of the shoulders of your roads.